Yokogawa CS 3000 System Projects

Budget: $2MM TIC
Scope: Turn-Key Design, Integration and Configuration

ACE completed several small projects in multiple areas of the refinery on existing Yokogawa CS 3000 system.  ACE provided turn-key design, integration, and configuration services for these projects.